BCS Construction has provided quality workmanship for over 35 years, some of our past clients include:










Case Studies





Foxboro, MA
Conference Facility
BCS provided services to design, permit and construct an 18,000-gallon multi-compartment precast septic system, along with a horizontal precast 8,000-gallon grease trap and an associated dual head 20,000 SF leaching facility. In addition, BCS provided parking lot re-grading and reconstruction along with an associated sub-surface sewerage disposal system, for the facilities 300-car parking lot. This work was coordinated to not create interruption of event services.




Boston, MA
314 Newbury Street
BCS provided excavation and demolition services to support new helical piles, grade beams and a foundation. BCS work includes utility tie-ins along Newbury Street. The connections of the utilities will be planned and implemented as to not disrupt abutters and minimize interruptions to the traffic on the adjacent streets. BCS will provide traffic management and safety services including barriers, scaffolding, signage and police details.






Boston, MA
Charlestown Navy Yard
BCS provided demolition, excavation and concrete services to make way for the extension of the existing granite paver pedestrian traffic area. This work was done in compliance with the National Park Service standards. BCS performed this work while minimizing pedestrian and car traffic along the Freedom Trail.

Hingham, MA
Parking Lot Expansion
BCS provided services to design, permit and construct a 223-car parking lot expansion to service a 500 person call center. The work included mass excavation, sub-surface drainage system, wetland replication, site lighting, paving, curbing and associated landscaping.





Lexington, MA
Wetland Replication and Restoration
In accordance with a Massachusetts Department of Environmental Order and under the guise of the Massachusetts Attorney General’s Office, BCS provided services to remove illegally filled material and restore wetland conditions on a 5-acre site. Services included mass excavation of approximately 10,000 CY of material to be processed. Processing included regulated solid waste, fill and loam to be used for replication.
Past Projects

Boston, MA

Boston, MA

Stoughton, MA

Providence, RI

Mansfield, MA

Braintree, MA

Foxboro, MA

West Roxbury, MA
